Our Facilities

CLIENTS

FACILITY

ACTIVITIES

PERFORMED WORKS

*

“Vinchi Construcsion Gran Proje” Company

Government building of Turkmenistan

Heating, ventilation and conditioning and refrigerating systems (HVAC & RS)

  • Centralized ventilation and air conditioning system, 09-60 BTU/ h
    1000 PC Diameter 6-28mm, length 4600m
  • Fire alarm system, 5 digital stations with cables 3150 and 13400 m
  • Centralized access control system, 5 digital stations with cables 3150 and 13400 m
  • Video surveillance system, 5 digital stations with cables 1350 and 6000 m
  • Sound alarm system, 5 digital stations with cables 4600 and 13400 m
  • TV-system, 5 digital stations with cables 1200 and 6700 m
  • Telecommunication systems, 5 digital stations with cables 1200 and 6700 m
  • Parking system and Parking guidance system, 40 positions

*

Juiceplant "8-Яп"

Turkmenistan, Geokdepe

Electrical installation. Fire alarm system, Video surveillance system, Internal communication system

  • Fire alarm system, Video surveillance system, Internal communication system, electrification 35/0.4 kV, automation, transformer substation 35/0.4 kV
  • Earthworks

*

“CNPC” company

Central office in Turkmenistan

Data processing center, change of location

  • Installation of racks, servers, network equipment, telecommunications, video surveillance system, fire alarm and protection system

*

“CNIPC-BGP” company

Turkmenistan, gas field Saman-depe

Fiber optic communication

  • Laying of fiber optic cable, 130 km

*

“Rönessans” company

Ashgabat, TPI

Contract for delivery of equipment and installation of video surveillance system, access control and split ac systems

  • Installation of access control systems, and video surveillance system, 1075 pcs, cable 1350 m, split ac systems - 130 pcs

*

“Aktam” company

Secondary school building for 320 persons, Beleke settlement

Contract for delivery of equipment and installation of fire protection system, video surveillance system, language classrooms

  • Installation of fire alarm systems, video surveillance system, language classrooms

*

Seydi Oil Refinery

Road bitumen production unit with capacity of 37200 tons per year

Automatic process control system and fire protection system of bitumen production unit at Seydi Oil Refinery

  • Electrical works, С/Р 6 / 10kV, electrical panel 75 pcs, cable 64000 m Transformer 10/0.4 kV, 3 pcs, UPS 3 pcs, electrical panel 52 pcs, cable 9800 m, low current systems - cable 23000 m
  • Insulation for heating system, 82000 m2
  • Ventilation and air conditioning systems, system for cooling of air, materials and devices, 10273 pcs, copper pipes 998 m (HVAC & RS)

 

Turkmenbashi Complex of Oil Refineries

Electric desalter and dehydrator AT7, oil primary treatment unit

Automatic process control system and fire protection system and electrification

  • Construction / works with steel structures 1200 tons
  • Electrical works, M/d voltage 6/10 kV, electronic panel 80 pcs, cable 72000m, transformer 10/0.4 kV, 8 pcs, UPS 6 pcs, electrical panel 60 pcs, cable 12000m, low current systems, cable 23 000 m
  • Insulation for heating system, 105 000 m2
  • Ventilation and air conditioning systems, system for cooling of air, materials and devices, 10273 pcs, copper pipes 1158 m (HVAC & RS)

*

Turkmenistan, Airport Dashoguz

Dashoguz-Struifuelstation

Construction / Automatic process control system and fire protection system and electrification, system of emergency protection of electrification and mechanization

  • Earthworks, 3 ha
  • Electrification, 46 000 m cable
  • Pipeline d.315, 4800 m
  • Automation system and commissioning& start-up
  • Low current systems and video surveillance systems

 

“DRAGON OIL” LTD TURKMENISTAN

LAM-28

CCTV installation of offshore facilities of dragon oil LTD Turkmenistan

  • Cable Tray Installation
    Tray installation (375m)
    Earthing (375m)
    Lids (375m)
  • CCTV works
    Bracketry installation (8 off)
    Junction Box & camera installation (8 off)
    Environmental Camera installation(4 off)
    Cabinet Siting & Install (1off)
  • Cable install
    Cable Pulling (375m)
    Cable Tray Dressing (375m)
    Cable Labelling (12off )
    Terminations (12 off)
    Testing (12 off)
    Sectional inspection (1 off)

 

“DRAGON OIL” LTD TURKMENISTAN

LAM-22

CCTV installation of offshore facilities of dragon oil LTD Turkmenistan

  • Cable Tray Installation
    Tray installation (680m)
    Earthing (680m)
    Lids (680m)
  • CCTV works
    Bracketry installation (14 off)
    Junction Box & camera installation (14 off)
    Environmental Camera installation(4 off)
    Cabinet Siting & Install (1off)
  • Cable install
    Cable Pulling (680m)
    Cable Tray Dressing (680m)
    Cable Labelling (18off )
    Terminations (18 off)
    Testing (18 off)
    Sectional inspection (1 off)

 

“DRAGON OIL” LTD TURKMENISTAN

LAM-C

CCTV installation of offshore facilities of dragon oil LTD Turkmenistan

  • Cable Tray Installation
    Tray installation (365m)
    Earthing (365m)
    Lids (365m)
  • CCTV works
    Bracketry installation (10 off)
    Junction Box & camera installation (10 off)
    Environmental Camera installation(4 off)
    Cabinet Siting & Install (1off)
  • Cable install
    Cable Pulling (365m)
    Cable Tray Dressing (365m)
    Cable Labelling (12off )
    Terminations (14 off)
    Testing (14 off)
    Sectional inspection (1 off)

 

“DRAGON OIL” LTD TURKMENISTAN

LAM-F

CCTV installation of offshore facilities of dragon oil LTD Turkmenistan

  • Cable Tray Installation
    Tray installation (365m)
    Earthing (365m)
    Lids (365m)
  • CCTV works
    Bracketry installation (9 off)
    Junction Box & camera installation (9 off)
    Environmental Camera installation(4 off)
    Cabinet Siting & Install (1off)
  • Cable install
    Cable Pulling (365m)
    Cable Tray Dressing (365m)
    Cable Labelling (13off )
    Terminations (13 off)
    Testing (13 off)
    Sectional inspection (1 off)

 

“DRAGON OIL” LTD TURKMENISTAN

ZHDA

CCTV installation of offshore facilities of dragon oil LTD Turkmenistan

  • Cable Tray Installation
    Tray installation (325m)
    Earthing (325m)
    Lids (325m)
  • CCTV works
    Bracketry installation (10 off)
    Junction Box & camera installation (10 off)
    Environmental Camera installation(4 off)
    Cabinet Siting & Install (1off)
  • Cable install
    Cable Pulling (325m)
    Cable Tray Dressing (325m)
    Cable Labelling (14off )
    Terminations (14 off)
    Testing (14 off)
    Sectional inspection (1 off)

 

“DRAGON OIL” LTD TURKMENISTAN

DOTL CAMP

Fire alarm system, Video surveillance system, Internal communication system

  • Procurement and installation of fire signalization system in the DOTL CAMP.

 

“DRAGON OIL” LTD TURKMENISTAN

CPSF

Electric installation

  • Cabling works and control system interface on/of valves a CPSF

 

“DRAGON OIL” LTD TURKMENISTAN

CPSF

Electric installation

  • Electric and instrumentation works

 

“DRAGON OIL” LTD TURKMENISTAN

Aladja Harbor Gosp DOTL camp

Video surveillance system

  • Camera installation (60 pieces)

 

 

 

 

  •  